動土 / 修造 · Auspicious Dates
Auspicious Days for Starting Renovation in November 2027
Check against your birth year
Hides days that clash with your zodiac animal. Everything stays in this browser. Nothing is sent to our server.
November 2027: 8 Good, 13 Fair, 9 Avoid
Calendar
Every date, best first
- Mon 1 NovGood
- Mon 8 NovGood
- Tue 9 NovGood
- Fri 12 NovGood
- Sun 14 NovGood
- Sun 21 NovGood
- Wed 24 NovGood
- Fri 26 NovGood
- Wed 3 NovFair
- Thu 4 NovFair
- Fri 5 NovFair
- Sun 7 NovFair
- Thu 11 NovFair
- Sat 13 NovFair
- Tue 16 NovFair
- Wed 17 NovFair
- Fri 19 NovFair
- Tue 23 NovFair
- Thu 25 NovFair
- Sun 28 NovFair
- Mon 29 NovFair
- Tue 2 NovAvoid
閉 Close day
- Sat 6 NovAvoid
歲破 Year breaker: clashes the Goat year · 四絕 Eve of a new season (立 term)
- Wed 10 NovAvoid
破 Destruction day, the month breaker
- Mon 15 NovAvoid
閉 Close day
- Thu 18 NovAvoid
歲破 Year breaker: clashes the Goat year
- Sat 20 NovAvoid
楊公忌 Yang Gong taboo day
- Mon 22 NovAvoid
破 Destruction day, the month breaker
- Sat 27 NovAvoid
閉 Close day
- Tue 30 NovAvoid
歲破 Year breaker: clashes the Goat year
About starting renovation dates
The almanac calls starting construction 動土 (moving the earth) or 修造 (repairs and building). Only the first day of work, usually the first hacking or drilling, needs a good date. After that, the contractor can work to their own schedule.
Good days fall on 成 Success, 開 Open, 定 Stable or 執 Initiate, a hands-on day that suits building. We skip Destruction and Close days, year-breaker days, the eve of each season change and Yang Gong taboo days. Hungry Ghost month is not excluded here, but some families still avoid it.
Renovation also looks at the Sha (三煞) direction. If you tell us which side of the flat the work starts on, the calendar removes days whose Sha falls on that side.
Questions about starting renovation dates
Which side of the flat counts?
Stand in the centre of the flat and use a compass. The side is where the first work happens, for example a kitchen in the North or a bathroom in the Southwest. If several areas start at once, choose the side with the heaviest work.
Does the time of day matter?
Some families have the first strike done in the morning, often on a wall in a favourable direction. Most contractors are happy to start early on the chosen day.
What if my only available date is a Fair day?
Fair days have no traditional exclusions, so they are a reasonable start. Avoid Destruction days and days that clash with the owners’ animals if you can.
What about Hungry Ghost month?
The classic renovation rules do not exclude the 7th lunar month, so those days are not greyed out here. Many families still prefer to avoid starting work then, so you may want to skip it too.
Do I need a good date for every phase?
No. The tradition focuses on the first day of work. Some families also choose a day for installing the main door or the stove, but that is optional.
Want a date chosen for your whole family's charts?
Get a personal date selection report. It checks every household member's full BaZi chart, not just their animal, and suggests the best days and hours. Join the waitlist and we'll email you when it opens.
A simplified traditional method for reflection and cultural interest. For a wedding, a business launch or a major purchase, many families also consult a feng shui master.
