動土 / 修造 · Auspicious Dates
Auspicious Days for Starting Renovation in October 2027
Check against your birth year
Hides days that clash with your zodiac animal. Everything stays in this browser. Nothing is sent to our server.
October 2027: 11 Good, 11 Fair, 9 Avoid
Calendar
Every date, best first
- Sat 2 OctGood
- Tue 5 OctGood
- Thu 7 OctGood
- Fri 8 OctGood
- Thu 14 OctGood
- Fri 15 OctGood
- Mon 18 OctGood
- Wed 20 OctGood
- Tue 26 OctGood
- Wed 27 OctGood
- Sat 30 OctGood
- Mon 4 OctFair
- Wed 6 OctFair
- Sun 10 OctFair
- Mon 11 OctFair
- Tue 12 OctFair
- Sun 17 OctFair
- Tue 19 OctFair
- Fri 22 OctFair
- Sat 23 OctFair
- Fri 29 OctFair
- Sun 31 OctFair
- Fri 1 OctAvoid
歲破 Year breaker: clashes the Goat year
- Sun 3 OctAvoid
破 Destruction day, the month breaker
- Sat 9 OctAvoid
閉 Close day
- Wed 13 OctAvoid
歲破 Year breaker: clashes the Goat year
- Sat 16 OctAvoid
破 Destruction day, the month breaker
- Thu 21 OctAvoid
閉 Close day
- Sun 24 OctAvoid
楊公忌 Yang Gong taboo day
- Mon 25 OctAvoid
歲破 Year breaker: clashes the Goat year
- Thu 28 OctAvoid
破 Destruction day, the month breaker
About starting renovation dates
The almanac calls starting construction 動土 (moving the earth) or 修造 (repairs and building). Only the first day of work, usually the first hacking or drilling, needs a good date. After that, the contractor can work to their own schedule.
Good days fall on 成 Success, 開 Open, 定 Stable or 執 Initiate, a hands-on day that suits building. We skip Destruction and Close days, year-breaker days, the eve of each season change and Yang Gong taboo days. Hungry Ghost month is not excluded here, but some families still avoid it.
Renovation also looks at the Sha (三煞) direction. If you tell us which side of the flat the work starts on, the calendar removes days whose Sha falls on that side.
Questions about starting renovation dates
Which side of the flat counts?
Stand in the centre of the flat and use a compass. The side is where the first work happens, for example a kitchen in the North or a bathroom in the Southwest. If several areas start at once, choose the side with the heaviest work.
Does the time of day matter?
Some families have the first strike done in the morning, often on a wall in a favourable direction. Most contractors are happy to start early on the chosen day.
What if my only available date is a Fair day?
Fair days have no traditional exclusions, so they are a reasonable start. Avoid Destruction days and days that clash with the owners’ animals if you can.
What about Hungry Ghost month?
The classic renovation rules do not exclude the 7th lunar month, so those days are not greyed out here. Many families still prefer to avoid starting work then, so you may want to skip it too.
Do I need a good date for every phase?
No. The tradition focuses on the first day of work. Some families also choose a day for installing the main door or the stove, but that is optional.
Want a date chosen for your whole family's charts?
Get a personal date selection report. It checks every household member's full BaZi chart, not just their animal, and suggests the best days and hours. Join the waitlist and we'll email you when it opens.
A simplified traditional method for reflection and cultural interest. For a wedding, a business launch or a major purchase, many families also consult a feng shui master.
