動土 / 修造 · Auspicious Dates
Auspicious Days for Starting Renovation in December 2025
This is a past month, kept for reference.
Check against your birth year
Hides days that clash with your zodiac animal. Everything stays in this browser. Nothing is sent to our server.
December 2025: 12 Good, 13 Fair, 6 Avoid
Calendar
Every date, best first
- Mon 1 DecGood
- Thu 4 DecGood
- Sat 6 DecGood
- Sun 7 DecGood
- Sat 13 DecGood
- Sun 14 DecGood
- Wed 17 DecGood
- Fri 19 DecGood
- Thu 25 DecGood
- Fri 26 DecGood
- Mon 29 DecGood
- Wed 31 DecGood
- Wed 3 DecFair
- Fri 5 DecFair
- Tue 9 DecFair
- Wed 10 DecFair
- Thu 11 DecFair
- Tue 16 DecFair
- Thu 18 DecFair
- Sun 21 DecFair
- Mon 22 DecFair
- Tue 23 DecFair
- Wed 24 DecFair
- Sun 28 DecFair
- Tue 30 DecFair
- Tue 2 DecAvoid
破 Destruction day, the month breaker
- Mon 8 DecAvoid
閉 Close day · 歲破 Year breaker: clashes the Snake year
- Fri 12 DecAvoid
楊公忌 Yang Gong taboo day
- Mon 15 DecAvoid
破 Destruction day, the month breaker
- Sat 20 DecAvoid
閉 Close day · 歲破 Year breaker: clashes the Snake year · 四離 Eve of an equinox or solstice
- Sat 27 DecAvoid
破 Destruction day, the month breaker
About starting renovation dates
The almanac calls starting construction 動土 (moving the earth) or 修造 (repairs and building). Only the first day of work, usually the first hacking or drilling, needs a good date. After that, the contractor can work to their own schedule.
Good days fall on 成 Success, 開 Open, 定 Stable or 執 Initiate, a hands-on day that suits building. We skip Destruction and Close days, year-breaker days, the eve of each season change and Yang Gong taboo days. Hungry Ghost month is not excluded here, but some families still avoid it.
Renovation also looks at the Sha (三煞) direction. If you tell us which side of the flat the work starts on, the calendar removes days whose Sha falls on that side.
Questions about starting renovation dates
Which side of the flat counts?
Stand in the centre of the flat and use a compass. The side is where the first work happens, for example a kitchen in the North or a bathroom in the Southwest. If several areas start at once, choose the side with the heaviest work.
Does the time of day matter?
Some families have the first strike done in the morning, often on a wall in a favourable direction. Most contractors are happy to start early on the chosen day.
What if my only available date is a Fair day?
Fair days have no traditional exclusions, so they are a reasonable start. Avoid Destruction days and days that clash with the owners’ animals if you can.
What about Hungry Ghost month?
The classic renovation rules do not exclude the 7th lunar month, so those days are not greyed out here. Many families still prefer to avoid starting work then, so you may want to skip it too.
Do I need a good date for every phase?
No. The tradition focuses on the first day of work. Some families also choose a day for installing the main door or the stove, but that is optional.
Want a date chosen for your whole family's charts?
Get a personal date selection report. It checks every household member's full BaZi chart, not just their animal, and suggests the best days and hours. Join the waitlist and we'll email you when it opens.
A simplified traditional method for reflection and cultural interest. For a wedding, a business launch or a major purchase, many families also consult a feng shui master.
